1Table of Contenets1. Introduction 22. Important Safety Instructions 33. Battery Cabinet Installation 53.1 Preparation 53.2 Transportati
10The battery cabinet contains valve-regulated recombinant lead-acid (VRLA) batteries, which are maintenance-free relative to the electrolyte. You can
11Note: All dimensions are in inches.6. Diagrams 6.1 Battery Cabinet Diagram (3 Shelves)28.806.0032.46.00Battery ChargerBattery Charger3.254.504.50Bat
126. Diagrams (continued)6.2 Battery and Breaker Diagrams240 VDC Battery Diagram 192 VDC Battery Diagram 192/240 VDC Breaker DiagramNotes• All intern
136. Diagrams (continued)6.3 Integrated Battery Charger (Select Models)Notes:• All dimensions are in inches.• AC input is preset with fuses for 120V
147. Specifications7.1 Dimensions and Floor LoadingBattery Cabinet Model ShelvesDimensions(Width x Depth x Height)Weight Floor LoadingBP240V557C-1PH 33
15StorageThe battery cabinet must be stored in a clean, secure environment with a temperature less than 40° C (104° F) and a relative humidity less th
16201111193-93-2847B1111 W. 35th Street, Chicago, IL 60609 USAwww.tripplite.com/support
21. IntroductionTripp Lite’s Extended-Run Single-Phase Battery Cabinets connect to SmartOnline 3-Phase UPS Systems to provide long-lasting battery bac
32. Important Safety InstructionsSAVE THESE INSTRUCTIONS All sections of this manual contain instructions and warnings that must be followed during th
42. Important Safety Instructions (continued)Battery Warnings• The battery cabinet does not require routine maintenance by the user. There are no use
53. Battery Cabinet InstallationRead Section 2 – Important Safety Instructions Before Installation3.1 Preparation1. At your site, prepare to off-load
63. Battery Cabinet Installation (continued)3.4 Internal Wiring (Typical)• Battery cabinets use multiple 12 VDC batteries connected in series to prov
73. Battery Cabinet Installation (continued)3.7 Electrical ConnectionDANGER! LETHAL HIGH VOLTAGE HAZARD!All wiring should be performed by a qualified e
8Figure 3.10aFigure 3.10bFigure 3.10c3. Battery Cabinet Installation (continued)3.10 Daisy-Chaining Multiple Battery CabinetsAdditional battery string
94. Operation and Charging4.1 Determine Charging VoltagesTo determine the appropriate equalization (freshening) charge voltage and float charge voltage